Skip navigation View desktop version

Surrey County Council

What's behind the website banner?

General enquiries: 03456 009 009

Text size

Help tools


Site search


Global navigation

Travel disruptions

The table below shows a list of all issues.

Calendar

Select the date for showing the disruptions

        

Display options

Disruptions summary

Name Location Start End Severity
M3 westbound between J1 and J2 westBound M3 westbound between J1 and J2. Direction = westBound 03/11/2014 22:00 28/03/2017 05:00 roadworksSevere
M3 eastbound between J3 and J2 eastBound M3 eastbound between J3 and J2. Direction = eastBound 02/03/2015 22:00 10/03/2015 06:00 roadworksSevere
M3 J3 eastbound access eastBound M3 J3 eastbound access. Direction = eastBound 03/03/2015 22:00 10/03/2015 06:00 roadworksSevere
M3 J4A westbound access westBound M3 J4A westbound access. Direction = westBound 01/03/2015 21:00 07/03/2015 06:00 roadworksSevere
A3 northbound between A247 and B2039 northBound A3 northbound between A247 and B2039. Direction = northBound 05/03/2015 22:00 07/03/2015 06:00 roadworksSevere
M25 clockwise at the Clacket Lane services slip road between J5 and J6 clockwise M25 clockwise at the Clacket Lane services slip road between J5 and J6. Direction = clockwise 04/03/2015 22:00 07/03/2015 05:30 roadworksSevere
M23 southbound between J8 and J9 southBound M23 southbound between J8 and J9. Direction = southBound 26/02/2015 20:00 02/04/2015 06:00 roadworksSevere
J15 clockwise J15. Direction = clockwise 04/03/2015 22:00 07/03/2015 06:00 roadworksSevere
M25 clockwise from Jct 15 to Jct 16 M25 clockwise from Jct 15 to Jct 16 Unknown Unknown congestionSevere
M25 clockwise from J14 (A3113) to J15 (M4) M25 clockwise from J14 (A3113) to J15 (M4) Unknown Unknown congestionSevere
M25 clockwise from J13 (A30) to J14 (A3113) M25 clockwise from J13 (A30) to J14 (A3113) Unknown Unknown congestionSevere
M25 anti-clockwise from Jct 13(A30) to Jct 12(M3) M25 anti-clockwise from Jct 13(A30) to Jct 12(M3) Unknown Unknown congestionModerate
A3 southbound from Jct with B3001 to Jct with A272 (Inc. Hindhead Tunnel) A3 southbound from Jct with B3001 to Jct with A272 (Inc. Hindhead Tunnel) Unknown Unknown congestionModerate
M25 anti-clockwise from Jct 7(M23 J8) to Jct 5(M26) M25 anti-clockwise from Jct 7(M23 J8) to Jct 5(M26) Unknown Unknown congestionModerate
LAY NEW MAIN AND SERVICE FROM NEARSIDE VERGE TO SITE. 3M PUBLIC... VERGE O/S PERRY WOOD SCOUT CAMP... 02/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Gas main replacement. To lay 352m of 180mm PE LP main, relay 67 services, make 9 connections and aba... From the junction with Collier Close to the junction with Ashby Avenue. Both sides in Carriageway Fo... 09/12/2014 00:00 10/03/2015 23:59 roadworksModerate
To excavate and lay new gas main to new development (2m x 0.5m CW, 1m x 0.5m FW)... Outside number 116 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
INSTALLATION OF TELECOM DUCTS AND CHAMBERS IN F/W AND C/W -. 4 WAY, 3 WAY AND 2 WAY LIGHTS + PRIORIT... 100M PAST J/O WORSELEY ROAD TO J/O GUILDFORD ROAD... 10/02/2015 00:00 06/03/2015 23:59 roadworksModerate
ROPE BLOWING , TOP SOILING AND SEEDING - NO EXCAVATION AS DISCUSSED WITH MICHELLE.... J/O DEEP CUT BRIDGE ROAD TO J/O GAPEMOUTH... 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... O/S 220& O/S 16 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... J/O BRUNSWICK ROAD TO J/O BAGSHOT ROAD... 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... O/S 220& O/S 16 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... J/O BRUNSWICK ROAD TO J/O BAGSHOT ROAD... 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... J/O BRUNSWICK ROAD TO J/O BAGSHOT ROAD... 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... O/S 220& O/S 16 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... O/S 220& O/S 16 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... O/S 220& O/S 16 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... J/O BRUNSWICK ROAD TO J/O BAGSHOT ROAD... 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
INTERIM TO PERM REINSTATEMENT IN C/W AS DISCUSSED WITH GARY CURTIS - OFF PEAK WORKING ONLY AS PER RE... J/O BRUNSWICK ROAD TO J/O BAGSHOT ROAD... 06/03/2015 00:00 07/03/2015 23:59 roadworksModerate
Sewage cleaning Weybourne Road off the Junction with Hale Roundabout... 23/02/2015 00:00 06/03/2015 23:59 roadworksModerate
INSTALLATION OF FLIP DEVICE, WORKS IN THE CARRIAGEWAY, OPTIMISE ON BEHLAF OF THMAES WATER.... O/S 90& 90A - 98 23/02/2015 00:00 09/03/2015 23:59 roadworksModerate
Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE... 220 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Laying box culvert to upsize the existing sewer.& Water main diversion... From Juction of Rosebery Cres to Kingfield Rd... 10/11/2014 00:00 25/05/2015 23:59 roadworksModerate
STOP TAP - INSTALL; WORKING IN THE FOOTWAY... DARLEY, 87, SPINNEY HILL, ADDLESTONE, SURREY... 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Demolish and rebuild box in carriageway... 67 Reigate Travel LTD, Bell Street, Reigate, Surrey... 06/03/2015 00:00 10/03/2015 23:59 roadworksModerate
On the M3 eastbound between junctions J4 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/489221,160329 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 eastbound between junctions J4 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. 06/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 eastbound between junctions J4 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/489221,160329 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 eastbound between junctions J4 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. 06/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 eastbound between junctions J3 and J2, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/497029,164817 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 eastbound between junctions J3 and J2, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. 06/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 eastbound between junctions J3 and J2, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/497029,164817 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 eastbound between junctions J3 and J2, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. 06/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J3 and J4, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/489218,160299 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 westbound between junctions J3 and J4, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. 06/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J3 and J4, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/489218,160299 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 westbound between junctions J3 and J4, minor delays can be expected at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 6 March 2015 to 28 March 2015. 06/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J3 and J4, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 westbound between junctions J3 and J4, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J3 and J4, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 westbound between junctions J3 and J4, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 05/03/2015 22:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 05/03/2015 22:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J2 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 10 pm and 6 am, from 19 February 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/497068,164815 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 westbound between junctions J2 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 10 pm and 6 am, from 19 February 2015 to 28 March 2015. 19/02/2015 22:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J2 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 10 pm and 6 am, from 19 February 2015 to 28 March 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/497068,164815 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 westbound between junctions J2 and J3, minor delays can be expected at peak times due to roadworks closing two lanes, between 10 pm and 6 am, from 19 February 2015 to 28 March 2015. 19/02/2015 22:00 28/03/2015 06:00 roadworksModerate
On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 27/02/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 eastbound between junctions J3 and J2, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 27/02/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M25 clockwise between junctions J5 and J6, there are currently delays of 10 mins due to roadworks closing three lanes. Expect disruption until 5:30 am. On the M25 clockwise between junctions J5 and J6, there are currently delays of 10 mins due to roadworks closing three lanes. Expect disruption until 5:30 am. 02/03/2015 22:00 09/03/2015 05:30 roadworksModerate
The M3 eastbound is closed between junctions J3 and J2, due to roadworks. Road expected to re-open from 6:00 am. The M3 eastbound is closed between junctions J3 and J2, due to roadworks. Road expected to re-open from 6:00 am. 02/03/2015 22:00 10/03/2015 06:00 roadworksModerate
The M3 eastbound is closed between junctions J3 and J2, due to roadworks. Road expected to re-open from 6:00 am. The M3 eastbound is closed between junctions J3 and J2, due to roadworks. Road expected to re-open from 6:00 am. 02/03/2015 22:00 10/03/2015 06:00 roadworksModerate
The M3 eastbound entry slip at junction J3 is closed , due to roadworks. Road expected to re-open from 6:00 am. The M3 eastbound entry slip at junction J3 is closed , due to roadworks. Road expected to re-open from 6:00 am. 03/03/2015 22:00 10/03/2015 06:00 roadworksModerate
The M3 eastbound entry slip at junction J3 is closed , due to roadworks. Road expected to re-open from 6:00 am. The M3 eastbound entry slip at junction J3 is closed , due to roadworks. Road expected to re-open from 6:00 am. 03/03/2015 22:00 10/03/2015 06:00 roadworksModerate
The A3 northbound is closed between the junctions with the A247 and the M25, due to roadworks. Road expected to re-open from 6:00 am. The A3 northbound is closed between the junctions with the A247 and the M25, due to roadworks. Road expected to re-open from 6:00 am. 05/03/2015 22:00 07/03/2015 06:00 roadworksModerate
The A3 northbound is closed between the junctions with the A247 and the M25, due to roadworks. Road expected to re-open from 6:00 am. The A3 northbound is closed between the junctions with the A247 and the M25, due to roadworks. Road expected to re-open from 6:00 am. 05/03/2015 22:00 07/03/2015 06:00 roadworksModerate
The M25 clockwise exit slip to Clacket Lane Services is closed , due to roadworks. Road expected to re-open from 5:30 am. The M25 clockwise exit slip to Clacket Lane Services is closed , due to roadworks. Road expected to re-open from 5:30 am. 04/03/2015 22:00 07/03/2015 05:30 roadworksModerate
The M25 clockwise exit slip to Clacket Lane Services is closed , due to roadworks. Road expected to re-open from 5:30 am. The M25 clockwise exit slip to Clacket Lane Services is closed , due to roadworks. Road expected to re-open from 5:30 am. 04/03/2015 22:00 07/03/2015 05:30 roadworksModerate
The M23 southbound is closed between junctions J8 and J9, due to roadworks. Road expected to re-open from 6:00 am. The M23 southbound is closed between junctions J8 and J9, due to roadworks. Road expected to re-open from 6:00 am. 26/02/2015 20:00 02/04/2015 06:00 roadworksModerate
The M23 southbound is closed between junctions J8 and J9, due to roadworks. Road expected to re-open from 6:00 am. The M23 southbound is closed between junctions J8 and J9, due to roadworks. Road expected to re-open from 6:00 am. 26/02/2015 20:00 02/04/2015 06:00 roadworksModerate
On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. On the M3 westbound between junctions J2 and J3, there are currently delays of 10 mins due to roadworks closing two lanes. Expect disruption until 6:00 am. 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
FERRULE - REPAIR IN VERGE& C/WAY... OPP HEATHER COTTAGE, LONGCROSS ROAD, CHERTSEY, SURREY... 05/03/2015 14:00 09/03/2015 23:59 roadworksModerate
Install tee and lay 2 m of duct in carriageway and 3m of duct in footway... o/s 26 Upper High Street... 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
On the M3 westbound between junctions J2 and J3, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 26 August 2014 to 28 August 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/497068,164815 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 westbound between junctions J2 and J3, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 26 August 2014 to 28 August 2015. 26/08/2014 21:00 28/08/2015 06:00 roadworksModerate
On the M3 westbound between junctions J2 and J3, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 26 August 2014 to 28 August 2015. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/497068,164815 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/ On the M3 westbound between junctions J2 and J3, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 9 pm and 6 am, from 26 August 2014 to 28 August 2015. 26/08/2014 21:00 28/08/2015 06:00 roadworksModerate
EXCAVATE TO LOCATE AND REPAIR GAS ESCAPE 2 WAY LIGHTS IN USE AND TO BE MANNED... IN FW OS 24 IN THE F/W AND C/W... 24/02/2015 12:00 09/03/2015 23:59 roadworksModerate
EXC TO LOCATE GAS ESCAPE - ROAD CLOSED PO NUMBER 1614081247... THIS IS A ROAD CLOSURE IN THE DRIVE GUILDFORD, RELATES TO WORKS IN THE CROSSWAYS GUILDFORD... 25/02/2015 12:00 09/03/2015 23:59 roadworksModerate
On the M3 westbound entry slip at junction J2 , minor delays are possible due to roadworks closing one lane. Expect disruption until 5:00 am on 28 March 2017. On the M3 westbound entry slip at junction J2 , minor delays are possible due to roadworks closing one lane. Expect disruption until 5:00 am on 28 March 2017. 04/11/2014 22:00 28/03/2017 05:00 roadworksModerate
On the M3 westbound entry slip at junction J2 , minor delays are possible due to roadworks closing one lane. Expect disruption until 5:00 am on 28 March 2017. On the M3 westbound entry slip at junction J2 , minor delays are possible due to roadworks closing one lane. Expect disruption until 5:00 am on 28 March 2017. 04/11/2014 22:00 28/03/2017 05:00 roadworksModerate
Emergency Gas Escape in progress.... *CORE&VAC* OS 58 IN THE CARRIAGEWAY... 03/03/2015 09:46 10/03/2015 23:59 roadworksModerate
Emergency Gas Escape is in Progress... Carriageway o/s Memorial Park... 02/03/2015 10:29 10/03/2015 23:59 roadworksModerate
WE ARE RENEWING OF WATER MAIN AND ASSOCIATED SERVICES... MORE LANE - ESHER HIGH STREET... 02/02/2015 00:00 09/05/2015 23:59 roadworksModerate
Emergency Gas Escape is in Progress... road outside rowlands cottage newchapel road... 05/03/2015 11:04 13/03/2015 23:59 roadworksModerate
LNS 3M FROM N/S CW/VERGE TO SITE. TO RUN FURTHER 33M IN SITE.... THE BARN, 81 THE STREET, GUILDFORD... 03/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Emergency Gas Escape is in Progress... CARRIDGEWAY O/s 78 04/03/2015 19:52 13/03/2015 23:59 roadworksModerate
Lay 300mtrs of 90mm using insertion method and abandon ex 6" CI main.15 service relays and 4 connect... From junction with Mayfield Road to roundabout at Queens Road / Queens Way in c/w f/w& vrge.... 16/02/2015 00:00 15/04/2015 23:59 roadworksModerate
M3 westbound between J2 and J3 westBound M3 westbound between J2 and J3. Direction = westBound 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
M25 clockwise between J11 and J12 clockwise M25 clockwise between J11 and J12. Direction = clockwise 22/10/2014 00:01 23/12/2016 23:59 roadworksModerate
M25 anti-clockwise between J13 and J12 anticlockwise M25 anti-clockwise between J13 and J12. Direction = anticlockwise 22/10/2014 00:01 23/12/2016 23:59 roadworksModerate
M3 eastbound between J3 and J2 eastBound M3 eastbound between J3 and J2. Direction = eastBound 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
M3 westbound between J3 and J4 westBound M3 westbound between J3 and J4. Direction = westBound 03/03/2015 21:00 28/03/2015 06:00 roadworksModerate
M3 westbound between J2 and J3 westBound M3 westbound between J2 and J3. Direction = westBound 05/03/2015 22:00 28/03/2015 06:00 roadworksModerate
M3 eastbound between J3 and J2 eastBound M3 eastbound between J3 and J2. Direction = eastBound 27/02/2015 21:00 28/03/2015 06:00 roadworksModerate
M3 eastbound between J3 and J2 eastBound M3 eastbound between J3 and J2. Direction = eastBound 03/11/2014 22:00 28/03/2017 05:00 roadworksModerate
M25 clockwise between J11 and J12 clockwise M25 clockwise between J11 and J12. Direction = clockwise 22/10/2014 00:01 23/12/2016 23:59 roadworksModerate
M25 anti-clockwise between J13 and J12 anticlockwise M25 anti-clockwise between J13 and J12. Direction = anticlockwise 22/10/2014 00:01 23/12/2016 23:59 roadworksModerate
M3 westbound between J1 and J2 westBound M3 westbound between J1 and J2. Direction = westBound 03/11/2014 22:00 28/03/2017 05:00 roadworksModerate
M3 eastbound between J3 and J2 eastBound M3 eastbound between J3 and J2. Direction = eastBound 03/11/2014 22:00 28/03/2017 05:00 roadworksModerate
22:00-05:00 hrs, M25 Anti-clockwise total closure for emergency electrical works. Diversion to M23 Jnc 9 and return. M25, Jn 8 to Jn 7. 06/03/2015 23:00 07/03/2015 06:00 roadworksModerate
Closed Follow Diversion 2200 to 0600 Smart Motorways M3, Jct 3 to 2 + On Slip North Bound. 06/03/2015 22:00 07/03/2015 06:00 roadworksModerate
Various TM - Narrow Lanes / Full Closures 24hrs Managed Motorways M3, Jct 4a to 2 North Bound. 04/11/2013 22:00 31/12/2015 06:00 roadworksModerate
M25 clockwise between J13 and J14 clockwise M25 clockwise between J13 and J14. Direction = clockwise 06/03/2015 17:53 06/03/2015 20:30 incidentModerate
A3 southbound between B2131 and A325 southBound A3 southbound between B2131 and A325. Direction = southBound 06/03/2015 18:12 06/03/2015 20:15 incidentModerate
A3 southbound between A3100 and A320 southBound A3 southbound between A3100 and A320. Direction = southBound 06/03/2015 19:05 06/03/2015 20:15 incidentModerate
2200-0530hrs M25 clockwise and anticlockwise to M23 northbound link roads closure, for surfacing and footway works, diversion to M25 Jct 6, A22 to Purley Cross or M25 Jct 8, A217, A2022 to Purley Cross. M23, M25 clockwise and anticlockwise to M23 northbound. 01/01/2015 22:00 05/12/2015 05:30 roadworksModerate
Contraflow 50mph Smart Motorways M3, Jct 4a to 4 North & South Bound. 02/12/2014 05:50 26/09/2015 06:00 roadworksModerate
22:00hrs to 05:30hrs: Link road closures anticlockwise for parapet repairs. Diversion to Jct 6. M23, M25 Anticlockwise to M23 North and Southbound link roads.. 06/03/2015 23:00 07/03/2015 06:00 roadworksModerate
Access to BT boxes required. 2 way rolling traffic lights will be required. Work will take place be... from jctn Felcourt rd/East Grinstead rd to Plaistow rd... 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Access to BT boxes required to recover redundant cable. 2 way rolling traffic lights will be require... from jctn Plaistow rd/East Grinstead rd to Godstone rd... 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
access req'd into UG network as per lux survey 133-s005375 lane closure night time working... A31 from jcn East Flexford Lane to Puttenham slip rdHogs Back Puttenham Surrey GU3 1AA... 03/03/2015 00:00 31/03/2015 23:59 roadworksModerate
access req'd into UG network as per lux survey 133-s005372 night time working... A31 from Cedarfield Stables to jcn Seale Hogs Back Puttenham Surrey GU10 1HE... 03/03/2015 00:00 31/03/2015 23:59 roadworksModerate
Access required into UG network An early start will be req'd as discussed with KM of SCC BDUK projec... Jcn A3 to A31 to Jcn east Flexford Lane Hogs Back puttenham Surrey GU3 1AA... 18/02/2015 00:00 13/03/2015 23:59 roadworksModerate
access req'd into UG network as per lux survey 133-s005375 lane closure night time working... JCN A3 to A31 to jcn East Flexford Lane Hogs Back Puttenham Surrey GU3 1AA... 03/03/2015 00:00 31/03/2015 23:59 roadworksModerate
Access required into UG network As per lux survey 133-s005115 Road Closure required Early start will... Access required required into UG network Knowle Lane Cranleigh Surrey GU6 8JP... 09/02/2015 00:00 09/03/2015 23:59 roadworksModerate
access required into UG network as per lux survey 133-s005115 Rd closure... access req'd into UG network Wildwood Lane Cranleigh Surrey GU6 8JR... 09/02/2015 00:00 09/03/2015 23:59 roadworksModerate
access req'd into UG network as per lux survey 133-s005115 Rd closure required... Access req'd into UG network Wildwood Lane Alford Cranleigh Surrey GU6 8JS... 09/02/2015 00:00 09/03/2015 23:59 roadworksModerate
access required into UG network as per lux survey 133-s005115 Rd closureEarly start will be required... access req'd into UG network Guildford Rd Alford Cranleigh Surrey GU6 8HE... 09/02/2015 00:00 09/03/2015 23:59 roadworksModerate
imd urgent: access required to ug netowrk to access jrc to replace flty cable with several oos cust... 492009-75000 O/S STROUD TOLL HOUSE on A286 GRAYSWOOD RD HASELMERE GU27 2DJ USRN:42600764... 26/02/2015 09:30 30/03/2015 23:59 roadworksModerate
Trace, then excavate to repair gas escape and reinstate where possible... ON BEND O/S BROOK PLACE... 05/03/2015 08:45 11/03/2015 23:59 roadworksModerate
Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Reposition 15m of 1 way poly duct... O/S 52, WEST STREET 05/03/2015 00:00 11/03/2015 23:59 roadworksModerate
Install 12m of 1 way poly duct in Footway... OPP ENT IMBERPARK KENNELS, CHARLTON LANE... 25/02/2015 00:00 10/03/2015 23:59 roadworksModerate
INSTALLATION OF TELECOM DUCTS AND CHAMBERS IN F/W AND C/W -programme agreed with Mariana... J/O WOODCOCK HILL TO WHITE GATES FARM... 16/02/2015 00:00 19/04/2015 23:59 roadworksModerate
INSTALLATION OF TELECOM DUCTS AND CHAMBERS IN F/W AND C/W - works programme agreed with Mariana - 3... WHITE GATES FARM TO J/O BYERS LANE... 02/03/2015 00:00 05/04/2015 23:59 roadworksModerate
INSTALLATION OF TELECOM DUCTS AND CHAMBERS IN F/W AND C/W - programme agreed with Mariana - 4 way li... J/O BYERS LANE TO J/O LAGHAM ROAD... 16/02/2015 00:00 15/03/2015 23:59 roadworksModerate
INSTALLATION OF TELECOM DUCTS AND CHAMBERS IN F/W - WALKWAY IN C/W - 2 WAY LIGHTS AS DISCUSSED WITH... OPPOSITE NUMBER 3 05/03/2015 00:00 10/03/2015 23:59 roadworksModerate
INSTALL NEW CONNECTION DUE TO REDHILL STATION WORKS... OUTSIDE MEMORIAL HALL... 23/02/2015 00:00 06/03/2015 23:59 roadworksModerate
reinstatement c/w between 2 and 5 06/03/2015 00:00 10/03/2015 23:59 roadworksModerate
reinstatement c/w between 2 and 5 06/03/2015 00:00 10/03/2015 23:59 roadworksModerate
reinstatement c/w between 2 and 5 06/03/2015 00:00 10/03/2015 23:59 roadworksModerate
reinstatement c/w between 2 and 5 06/03/2015 00:00 10/03/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
transfer 38 water services and make 10 final connections. dates agreed after site meeting with Sinmo... from junction with the Green along westhall road to junc searchwood road... 17/02/2015 00:00 06/04/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
make one back to back connection - 3days/make 12 long side connections and 17 short side connections... from o/s Sunrise to o/s woodlands house... 12/01/2015 00:00 18/03/2015 23:59 roadworksModerate
lay1124.0m of 125mm pe water pipe @ 12.0m per day = 93 days/ test,chlorinate ,flush and sample new m... from junction with Warren lane to o/s badgers bend... 05/01/2015 00:00 21/08/2015 23:59 roadworksModerate
lay1124.0m of 125mm pe water pipe @ 12.0m per day = 93 days/ test,chlorinate ,flush and sample new m... from junction with Warren lane to o/s badgers bend... 05/01/2015 00:00 21/08/2015 23:59 roadworksModerate
lay1124.0m of 125mm pe water pipe @ 12.0m per day = 93 days/ test,chlorinate ,flush and sample new m... from junction with Warren lane to o/s badgers bend... 05/01/2015 00:00 21/08/2015 23:59 roadworksModerate
lay1124.0m of 125mm pe water pipe @ 12.0m per day = 93 days/ test,chlorinate ,flush and sample new m... from junction with Warren lane to o/s badgers bend... 05/01/2015 00:00 21/08/2015 23:59 roadworksModerate
lay1124.0m of 125mm pe water pipe @ 12.0m per day = 93 days/ test,chlorinate ,flush and sample new m... from junction with Warren lane to o/s badgers bend... 05/01/2015 00:00 21/08/2015 23:59 roadworksModerate
lay1124.0m of 125mm pe water pipe @ 12.0m per day = 93 days/ test,chlorinate ,flush and sample new m... from junction with Warren lane to o/s badgers bend... 05/01/2015 00:00 21/08/2015 23:59 roadworksModerate
lay1124.0m of 125mm pe water pipe @ 12.0m per day = 93 days/ test,chlorinate ,flush and sample new m... from junction with Warren lane to o/s badgers bend... 05/01/2015 00:00 21/08/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 588.0m of 90mm PE water pipe @12.0m per day = 49 days/ test,flush,chlorinate and sample new main... from junction with Tweed lane to junction with Brockamhurst Rd... 29/01/2015 00:00 20/05/2015 23:59 roadworksModerate
lay 2280m @ 12.0m per day = 190 days / test chlorinate , flush and sample new main 22 days / transf... from roundabout at junction of Station Rd to junction with Old Reigate Rd... 19/01/2015 00:00 19/11/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay 1360m of 200mm ductile iron pipe @12.0m per day =113 days/ test ,chlorinate ,flush and sample ne... from o/s the wine warehouse adj. the roundabout with A25 to o/s Dawcombe cottage... 08/09/2014 00:00 20/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay main - continuation of M0006684 (where Pebble Hill road changes to Station road up to A25 rounda... cox plant hire london ltd to crown buildings... 31/10/2014 00:00 25/05/2015 23:59 roadworksModerate
lay 630m of 125mm pe water pipe @ 12.0m per day= 52 days/test , chlorinate , flush and sample new ma... from junction with Bramley way to end of Woodview close ( o/s Sunnymead)... 15/01/2015 00:00 02/07/2015 23:59 roadworksModerate
make road crossing for 90mm main into new development... opposite 53 27/02/2015 00:00 11/03/2015 23:59 roadworksModerate
lay 3046m of 180mm pe water main @60m per day= 50 days/ test, chlorinate flush and sample new main=... from junction Boar Hill to junction Guildford Road... 16/02/2015 00:00 19/06/2015 23:59 roadworksModerate
Locate and excavate 1 blockage in existing duct,locate and excavate 1 subsequent blockage in existin... WP1 JCN OF GREENMEADS WP2 27M NORTH EAST FROM JCN OF MOOR LANE ON , WESTFIELD ROAD... 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Provide 1 new pole IN F/W ASHGATE NO42A OPP NO77 IN WEST ST, WEST STREET... 06/03/2015 00:00 09/03/2015 23:59 roadworksModerate
REMEDIAL PERMIT FOR CARRIAGEWAY REINSTATEMENT... O/S HORTON FARM TO WHITE LEA COTTAGE ON , GUILDFORD ROAD... 06/03/2015 00:00 12/03/2015 23:59 roadworksModerate
REMEDIAL PERMIT FOR CARRIAGEWAY REINSTATEMENT... IN C/W O/S HORTON FARM TO WHITE LEA COTTAGE ON , GUILDFORD ROAD... 06/03/2015 00:00 12/03/2015 23:59 roadworksModerate
Provide BT poles in verge 0.5m x 0.5m and provide overhead cables along length of Bowlhead Green Roa... OPP FERNBANK TO JNC BEECH HILL, ON BOWLHEAD GREEN ROAD, BROOK... 23/02/2015 00:00 11/03/2015 23:59 roadworksModerate
Install 158m of 1 way poly duct in Carriageway,Install 5m of 1 way poly duct in Footway... O/S 106 TO OS 66 , THE STREET... 02/03/2015 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 1770m of 125mm pe water pipe@300.0m per week/ test,chlorinate ,flush ans sample new main-22 days... from junc. Brockhamhurst Rd to junc. tapners rd.... 10/12/2014 00:00 13/03/2015 23:59 roadworksModerate
lay 275.0m of 125mm pe water pipe@12.0m per day =22 days/ test, chlorinate ,flush and sample new mai... from junction wit Hextalls lane to o/s tanglewood... 05/02/2015 00:00 19/05/2015 23:59 roadworksModerate
lay 275.0m of 125mm pe water pipe@12.0m per day =22 days/ test, chlorinate ,flush and sample new mai... from junction wit Hextalls lane to o/s tanglewood... 05/02/2015 00:00 19/05/2015 23:59 roadworksModerate
lay 275.0m of 125mm pe water pipe@12.0m per day =22 days/ test, chlorinate ,flush and sample new mai... from junction wit Hextalls lane to o/s tanglewood... 05/02/2015 00:00 19/05/2015 23:59 roadworksModerate
lay 275.0m of 125mm pe water pipe@12.0m per day =22 days/ test, chlorinate ,flush and sample new mai... from junction wit Hextalls lane to o/s tanglewood... 05/02/2015 00:00 19/05/2015 23:59 roadworksModerate
CAP OFF SUPPLY AT MAIN - WORKING IN CARRIAGEWAY... OUTSIDE KINGS BARN 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Install 75m of 1 way poly duct in Footway... OPP 34 TO 75M SOUTH FROM OPP 34, COPSEM LANE... 02/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Install 26m of 1 way poly duct in Footway,Install 7m of 1 way poly duct in Carriageway... S/O 1A HIGH ST TO O/S 8/12 BARCLAYS BANK PLC ON, CHURCH STREET... 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
TO RELAY 180 METERS OF OLD DRINKING WATER MAIN AND 22 RELATED SERVICES... beween Lawday Link and Spring Lane west... 05/01/2015 00:00 31/08/2015 23:59 roadworksModerate
Detailed examination of rail under road bridge. Between the hours 22.00 - 06.00hrs. Footpath closures required Bridge Road over Rail) - No: 13/5, From 155 metres to 180 metres south east of the junction with Stoneleigh Park Road 05/03/2015 00:00 07/03/2015 23:59 roadworksModerate
Detailed examination of bridge between the hours of 22:00 and 06:00 Bridge (Rail Over Road) Named SWE No: 3/62 05/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Bridge Maintenance working from 21.00-05.30 Bridge (Rail Over Road) RDG1 No: 4/11 03/03/2015 00:00 13/03/2015 23:59 roadworksModerate
Bridge maintenance working from 21.00-05.30 Bridge (Rail Over Road) WPH1 No: 17/51 03/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Capital Programmes:INSTALL 11KV HV CABLES: (APPROX DEPTH 600mm):To lay new electricity cables from E... Junction of Hogthrough Lane up to South Nutfield Grid. c\w. verge.... 30/01/2015 00:00 09/03/2015 23:59 roadworksModerate
Network Operations Faults:STREETLIGHT FAULT: (APPROX DEPTH 450mm):... o/s church hall, jct highlands road and o/s cemetary. f\w. c\w.... 27/02/2015 09:10 09/03/2015 23:59 roadworksModerate
Replace damaged pedestal at Level Crossing on the Up and Down roads. Full Road Closure at Pooley Green LC - from 23:30 Sat 17th to 05:30 Sun 18th January 2015 . Level crossing on Vicarage Road, Egham 17/01/2015 23:30 18/09/2015 23:59 roadworksModerate
Network Operations Faults:LV Mains Fault:... o/s 3-5. f\w. c\w. 02/03/2015 10:30 10/03/2015 23:59 roadworksModerate
Network Operations Faults:LV Mains Fault:Incorrectly raised under 20171377 initially... JUNCTION OF HOE LANE ANDFRANKSFIELD PEASLAKE. c\w. verge.... 27/02/2015 17:31 10/03/2015 23:59 roadworksModerate
TRENCHING JOINT HOLE EXCAVATIONS AND LAYING OF A HIGH VOLTAGE CABLE ON LONDON ROAD BACKFILL AND REIN... FROM BP GARAGE JUNC BRIDGE ROAD TO SITE AT NORCUTTS GARDEN CENTRE... 17/02/2015 00:00 06/05/2015 23:59 roadworksModerate
Network Operations Faults:STREETLIGHT FAULT: (APPROX DEPTH 450mm):... opp Ruffetts way. c\w. verge.... 05/03/2015 10:50 13/03/2015 23:59 roadworksModerate
install 10 meter pole in verge with 2 stays, string conductor across the road to opposite pole in se... adj Brook Garden Centre Haslemere road A286 Brook Godalming... 25/02/2015 00:00 09/03/2015 23:59 roadworksModerate
REPLACE COVER& FRAME CASTLE STREET JCT CASTLE SQUARE JCT STYCHENS LANE BLETCHINGLEY RE... 05/03/2015 08:00 06/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... The junction of Walton Road and Esher Road for 20m including circular highway... 25/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... e) 17/07/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between the junctions of Chessington Road to Gatley Avenue... 17/07/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Longmead Road to the junction Blenheim Road... 07/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Green Lane) 28/07/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... djacent to 58 29/07/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction The Roundway to the junction Telegraph Lane... 19/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... otways 29/07/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the boundary of number 5 to the junction approx. 35m from number 8... 07/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Langley Vale Road to the junction Harding Road... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Chipstead Road for the entire length... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between numbers 65 and 87, approx. 100m... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Brighton Road (A23) to Victoria Road, approx. 315m... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Vicarage Lane for the entire length... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Fountain Road to Church Road... 08/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Bletchingley Road opposite numbers 21/23 to the other junction onto Bletchingley R... 08/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... oad opposite 93/95 08/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... ) 01/07/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire road north of the junction with Gainsborough Road... 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Guildford Road for the entire length... 19/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the entrance of Holdhurst Farm to approx. 80m west of Bettons... 19/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between the junction Guildford Road to approx. 80m west of Bettons.... 19/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between junctions Woodside Road to Petworth Road... 19/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction St Judes Road to Blays Lane... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... On the footway from the roundabout to the junction onto Bourne Way... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the Mayford roundabout to the mini roundabout junction where it joins Westfield Road... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Barnby Road to house number 69.... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Madeira Road for the entire length... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From adjacent to number 1 to adjacent with Lynton House, please see attached map... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Whopshott Avenue for the entire length, please see attached map... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 28/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Pyrford Road/Warren Lane for the entire length... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the Pavillion to New Road... 10/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 28/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 28/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 28/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between the junction Haste Hill/Scotland Lane/Tennysons Lane to junction of The Common... 05/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Waitrose to Chestnut Avenue... 05/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between junction of Green Lane to number 71... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between entrance of Quemsmuir Cottage to Sandy Farm... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Outside Sandy Farm for approx 130m... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From Church Road to Kings Road... 25/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length... 12/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction High Street to the car park... 25/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of road... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Massetts Road to the northern boundary of number 25... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From Balcombe Road for the entire length of the road... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Kingsley Road for the entire length... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Chart Lane and Crakell Road for 20m... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Tattenham Grove/Merland Rise for the entire length... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction with Downs Way to number 22a, approx. 100m... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between junctions Upper Bridge Road/Oakdene Road to junction of Chapel Road... 03/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Brighton Road to the eastern boundary of number 77... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Outside number 3 to the junction of London Road (approx. 100m)... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between junction of High Street/Consort Way to number 14... 03/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 28/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Gloucester Road to the junction London Road and to the southern boundary of Cla... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... rendon House 27/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction with Pendleton Road to Cronks Hill/Cronks Hill Road (entire length or road)... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Cronks Hill to entrance of Linden Heights, approx. 50m... 03/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 22/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 28/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 04/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length of the road... 28/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of London Road North/Brighton Road (A23) to the junction of Alderstead Lane... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... The west side for the entire length... 12/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... On the east side for the entire length... 12/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length on the west side lane of the carriageway.... 01/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 14/01/2015 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015... Between RUSHAM COTTAGE to the footpath, approx. 30m... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between the junction of Hanworth Road Slip Road to the front of Annandale House... 27/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... rea 22/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between number 19 to the end of cul-de-sac by numbers 27/28... 27/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... At the speed bump outside Premier Inn... 22/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From number 70 to the junction Adelphi Road... 07/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Surfacing Works Between Cherry Way to number 18 (joint of concrete section)... 06/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 30/09/2014 00:00 31/03/2015 23:59 roadworksModerate
S278 works for Firestation... Multiple locations along A25... 12/01/2015 00:00 04/04/2015 23:59 roadworksModerate
Malden Rushet Phase 6... Malden Rushet Junction... 23/02/2015 00:00 20/03/2015 23:59 roadworksModerate
Repair Gas Main Ash Rd to Goose Rye Road... 19/01/2015 00:00 03/04/2015 23:59 roadworksModerate
Junction Improvements... Morden Rushet Junction... 15/01/2015 00:00 18/06/2015 23:59 roadworksModerate
New sewer connection The George Inn, Frimley Road, Ash Vale... 24/02/2015 00:00 09/03/2015 23:59 roadworksModerate
ITS 'A30 London road, Egham ' SCHEMES WORKS (PHASE 3). Carriageway,Footway and Verge - Junction wid... 120m East of junction A30 Egham Hill / St. Jude's Rd (See also Permits for London road and St Judes... 17/11/2014 00:00 15/05/2015 23:59 roadworksModerate
ITS 'A30 London road, Egham ' SCHEMES WORKS (PHASE 3). Carriageway,Footway and Verge - Junction wid... From Englefield Cottage(A30 London Rd)to junct.A30 Egham Hill/St.Jude's Rd(See also Permits for Egha... 17/11/2014 00:00 15/05/2015 23:59 roadworksModerate
ITS 'A30 London road, Egham ' SCHEMES WORKS (PHASE 3). Carriageway,Footway and Verge - Junction wid... Junction A30 Egham Hill/St.Jude's Rd.Lights extend to 48 St. Jude's Rd.(See also Permits for Egham H... 17/11/2014 00:00 15/05/2015 23:59 roadworksModerate
Carriageway - new kerb lines and raising height of carriageway... Junction of Heath House, Saunders Lane and Blackhorse Road (Also see Permits for Blackhorse road and... 02/03/2015 00:00 03/04/2015 23:59 roadworksModerate
Construction of footway under the railway bridge and road resurfacing... the junction with the access road to Worplesdon Station... 09/02/2015 00:00 15/03/2015 23:59 roadworksModerate
Widen existing footway to create shared facility. Widen footway/footpath to form new footway cyclewa... On the townpath from adjacent to number 6 to Jewsons building yard... 26/01/2015 00:00 20/03/2015 23:59 roadworksModerate
Carriageway and Footway.New signalised pedestrian crossing. (Remove island, Kerbed build out, droppe... From 100m East of Snatts Hill to 100m West of Uvedale Road.... 23/02/2015 00:00 17/04/2015 23:59 roadworksModerate
Carriageway and Footway.New signalised pedestrian crossing. (Remove island, Kerbed build out, droppe... Approx 75m from East Hill along Westerham road; part of same Works with Snatts Hill Uvedale Road.... 05/03/2015 00:00 17/04/2015 23:59 roadworksModerate
Deep Cleanse of road and central reservation... Full length of road 23/02/2015 00:00 06/03/2015 23:59 roadworksModerate
Deep cleanse of street and central reservation... Full lenght of carriageway... 23/02/2015 00:00 06/03/2015 23:59 roadworksModerate
relocation of street lighting feeder pillar North East corner of Rosebury Park in colaboration with... North East corner of Rosebury Park... 02/03/2015 00:00 06/03/2015 23:59 roadworksModerate
CLEANING AND CCTV OF EXISTING DRAINAGE.... FROM JUNCTION WITH GARRATTS LANE TO PEMBROKE CLOSE.... 05/03/2015 00:00 16/03/2015 23:59 roadworksModerate
FW RECONSTRUCTION AND ASSOCIATED KERB WORKS.... FROM OUTSIDE No. 51 TO THE JUNCTION WITH NORTH STREET.... 26/01/2015 00:00 13/03/2015 23:59 roadworksModerate
Carriageway and Footway and Verge. New signals - fire station (ducting, chambers, NAL sockets. Linin... 50m North of junction with Lodge Lane to 100m South of junction with Lodge Lane.... 05/02/2015 00:00 13/03/2015 23:59 roadworksModerate
Drainage repair Carriageway... outside 2 Weston Lodge... 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Oaks Road to Riverside Place... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length... 12/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Surfacing Works Between Churchfield Road to the entrance of Weybridge Hosptial... 06/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire lenth of the road... 22/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Burwood Road to outside Church Cottage... 21/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Hare Lane to Manor Road South... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR townpath surfacing works to be carried out in the financial year of 2014 to... For the entire length of townpath... 21/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 21/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR footpath surfacing works to be carried out in the financial year of 2014 to... On the footpath from Love Lane to the footpath by Hill Park Nurseries, approx. 173m... 21/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction Speer Road adjacent to numbers 2/4... 24/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between number 2 to the junction of Bridge Road adjacent to number 140... 24/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... The slip road section at the junction of Bridge Gardens to the garages... 24/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 24/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Spencer Road to Bell Road... 17/02/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between 74 to 88 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between numbers 99 to 111... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between junction of Sandy Lane to Croxhall House... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between the junctions Fernbank Avenue to Oakbank Avenue... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Cottimore Lane to Fox Grove... 02/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Enton Mill West to the club house... 21/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Between Cobury Cottage to the club house... 21/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Bellmouth at junction of Mayhurst Avenue... 12/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 12/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 09/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Plant Mobilisation for the LSR works on Broomfield Park... At the junction of Broomfield Park... 04/03/2015 00:00 09/03/2015 23:59 roadworksModerate
JETTER IN CW. WHOLE ROAD. 02/03/2015 00:00 13/03/2015 23:59 roadworksModerate
Carriageway Patching Outside Boxgrove Villa GU21 2RP... 06/03/2015 00:00 10/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 20/01/2015 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 15/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... On Wonersh Bridge 15/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 15/11/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... HAINES BRIDGE JUST EAST OF THE JUNCTION WITH OATLANDS AVENUE.... 06/01/2015 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... JUNCTION WITH QUEENS ROAD APPROX 60M IN TOTAL MAX.... 06/01/2015 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... BETWEEN WHITE LANE AND CLARKS LANE... 28/11/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM JUNCTION WITH MILL HILL LANE TO OUTSIDE PROPERTY NUMBER 74... 04/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM KINGSTON ROAD TO CROMWELL ROAD... 02/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM FARM LANE TO PASS HARTLEY COTTAGE.... 15/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... 50M FROM CAR PARK ENTRANCE FOR APPROX 80M EASTWARDS.... 10/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM JUNCTION WITH MEADOWBROOK ROAD TO 25M OF THE SIDE OF PROPERTY No. 27... 16/12/2014 00:00 31/03/2015 23:59 roadworksModerate
CW AND FW REPAVING AND SLABBING.... FROM STATION ROUNDABOUT TO THE ENTRANCE TO THE HARLEQUIN CENTER.... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
REALIGNING THE ROUNDABOUT AND ALL ASSOCIATEED FW WORKS.... FROM MARKETFIELD CAR PARK TO STATION ROAD CAR PARK AND ON STATION ROAD ROUND ABOUT.... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
REALIGNING THE ROUNDABOUT AND ALL ASSOCIATEED FW WORKS. TRAFFIC SIGNAL INSTALATION.... A23 PRINCESS WAYFROM STATION ROAD ROUNDABOUT TO EXIT THE BUS STATION.... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
LSTF junction upgrade and cycle path... From the junction of Ladymead southwards for approx. 50m... 26/01/2015 00:00 15/05/2015 23:59 roadworksModerate
JUNCTION UPGRADES. KERB REALIGNMENT AND TRAFFIC SIGNAL INSTALLATION.... FROM LADYMEAD TO RIVER WAY BRIDGE.... 25/02/2015 00:00 22/05/2015 23:59 roadworksModerate
P400. Surfacing Between the junctions Povey Cross Road to Charlwood Road... 04/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way for the entire length... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way for the entire length... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from River Wey Navigation... 22/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between Abinger Common Road to Hollow Lane... 15/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Entire length of the road... 15/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400 surfacing On the carriage way from Wallis Wood Green Road to Horsham Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. surfacing On the carriage way from Stane Street to Ockley Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Works... On the carriage way from Zig Zag to Headley Common Rd... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Entire length of the road... 30/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between Middle Street to Wellhouse Lane... 30/10/2014 00:00 31/03/2015 23:59 roadworksModerate
p400. surfacing On the carriage way from middle street to reigate road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. surfacing On the carriage way from Cannon Grove to the end of the cul-de-sac... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing Works... On the carriage way from crabtree lane to the end of the country border, by the woods... 18/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Ockley Road to Walliswood green road... 16/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Lower Road to Church Road... 18/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the nortbound carriageway between London Road to the entrance of slip road by number 28... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Works... On the carriage way from Kennel Lane to Manorhouse Lane... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P.400 Surfacing On the carriage way from Dowsland House to Guildford Road... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Works... On the carriage way from Wellhouse Lane to 120m past Tweed Land... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way over the M25 bridge... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Brookwood Lye Road to Smarts Heath Road... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Rag Hill Road to Georges Hill Road... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Sufacing On the carriage way for the entire length... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way between Church Lane and Stafford Lakes... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Rocky Lanes to Crossways Lane... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Wray Lane to Crossways Lane... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400 Surfacing Works On the carriage way from Sparvel Way to Grand Avenue... 04/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. surfacing On the carriage way from the rail bridge to Gresham Road... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from South Lodge Farm to Runnymede House... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Works... On the carriage way from Gong HIll Drive to Frensham Vale... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400 Surfacing On the carriage way for the entire length... 04/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400 Surfacing On the carriage way for the entire length... 04/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between junction London Road, Bagshot to the roundabout... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between the roundabout to 52m east of Little Paddock... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Around the rouandbaout.... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way for the entire length... 04/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400 Surfacing On the carriage way for the entire length... 04/09/2014 00:00 31/03/2015 23:59 roadworksModerate
p400. Surfacing On the carriage way from Gasden Lane to Bowlhead Green Road... 28/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way for the entire length... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way for the entire length... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way for the entire lenght... 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
P400. Surfacgin On the carriage way for the entire length... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
p400. Surfacing On the carriage way brom Bowlhead Green Road to the end of the county boarder... 28/08/2014 00:00 31/03/2015 23:59 roadworksModerate
p400. surfacing On the carriage way from county boarder to Lower Road... 28/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Lower Road to Highcrombe Lane... 28/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between Frimley Road roundabout to adjacent to number 1/2... 06/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between number 23 to Frimley Road roundabout... 06/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Littlemead to A281.... 28/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Sutton Green Road to the Village Hall... 29/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Works... On teh carriage way from Stamford green road to bramble walk... 30/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing From Park Road junction to outside number 40... 19/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between Horton Road to number 74... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Works... On the carriage way from Brighton Road to number 14... 27/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Works... On the carriage way from the Roundabout to Timsway... 27/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Junction with Snows Ride to A30 London Road... 05/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing For the entire length of the road... 24/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between The Green to the county boundary at the junction with Tithepit Shaw Lane/Kingswood Lane... 24/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing From the junction Coldhabour Common Road to Windy Gap Car park sign... 24/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between the entrance of Cockshot Farm to approx. 50m east of the entrance to the carpark... 24/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between the junction of Coldhabour Common Road to approx. 50m east of the entrance to the carpark... 24/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between the junctions Warren Close to Wolsey Road... 30/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between number 16 to the junction onto High Street... 30/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between numbers 2/3 Heritage House to junction onto main section of Godston Road... 31/10/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between The Lodge to Runnymede House... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Project 400. On the carriage way from High Street to Worcester Park Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P.400. Surfacing On the carriage way from Ashley Road to Downs Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P.400. Surfacing On the carriage way from Hook Road to Chessington Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
p.400. Surfacing On the carriage way from Christchurch mount round to christchurch mount.... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P. 400 Surfacing On the carriage way from Old Malden Lane to Kingston Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P. 400. Surfacing On the carriage way from Summer Road to the end... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P.400. Surfacing On the carriage way from Summer Road to house number 15... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between Redwing Gardens to Dartnell Close... 06/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Entire length of the road... 06/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way for the entire length... 01/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Church Street to Monumont Hill... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P. 400. Surfacing On the carriage way from Spencer Road to Seymour Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P. 400. Surfacing On the carriage way from Seymour Road to Ray Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P.400 Surfacing On the carriage way from Bramble rise back round to bramble rias... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P. 400. surfacing On the carriage way from Golf Club Road to St Georges Avenue... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Vine Road to Hurst Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing Fleece Road to St Marys Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
p 400. Surfacing On the carriage way from St Albans to Thames Street... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from house number 40 to Farm Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way frmo Downside Bridge to Between Streets... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
p 400. surfacing On the carriage way from Downside bridge road to Chilbrook Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
p 400. Surfacing On the carriage way from Fairmile lane to the end... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way for the entire length from Belverede Gardens to Walton Road... 12/08/2014 00:00 31/03/2015 23:59 roadworksModerate
p 400. Surfacing Entire length of the road... 06/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Leonards Road to Station Road... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from St. Leonards Road to Station Road... 15/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing Works... On the carriage way from Buckingham Avenue to New Road... 21/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Fairmile Park Road... 13/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. surfacing works... On the carriage way from Littleheath Lane... 13/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. surfacing On the carriage way from Lonsdale Road to Brooklands Road... 13/08/2014 00:00 31/03/2015 23:59 roadworksModerate
p 400. surfacing on the carriage way from 58 to 130... 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
P400 Surfacing Works On the carriage way from Lower Breach Road to Ockley Road... 13/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. surfacing On the carriage way from Claygate Lane to Kingston by-pass... 13/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400 Surfacing Works... On the carriage way from Central Avenue to Armfield Close... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400 Surfacing Works... On the carriage way from High Street to Littleworth Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400 Surfacing Works... On the carriage way from Oatlands Drive to Ashley Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from the Drive to number 39... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P.400 Surfacing On the carriage way from Leigh Hill Road to the end of the cul-de-sac... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P. 400. Surfacing On the carriage way from St Leonards Rd to Thorkhill Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between the Queen's Road roundabout to Burwood Road Roundabout... 24/09/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. surfacing On the carriage way from Molesey Park Road to Walton Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from St Marys Road to the end of the cul-de-sac... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Holtwood way to the end of the cul-de-sac... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P. 400. surfacing On the carriage way from Brooklands Road to Queens Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Basingfield Rd to High Street... 02/09/2014 00:00 31/03/2015 23:59 roadworksModerate
p400. Surfacing On the carriage way from High street to Basing way... 28/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Merton Way to the end... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Oatlands Drive to the end... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Thames Street all around the island and back... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing Between Walton Road to number 10... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. surfacing On the carriage way from Weston Road to Weston Green Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Rectory Lane to Kingston by-pass... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P400. Surfacing On the carriage way from Kingston by Pass A309 to Clayton Rd... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
P 400. Surfacing On the carriage way from Wix Lane to Shere Road... 14/08/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Lockfield Drive to Brewery Road... 02/12/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Station Avenue to Ashley Road... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the entire carraiage way... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Surfacing Works... On the carriage way from Farnham Road to Onslow Street... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 31/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Hprsham Road to Parrot Inn... 31/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Clandon Close to London Road... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from High Street to Portsmouth Road... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Seven Hills Road to Painshill Rounabout... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Park Barn Drive to Barnwood Road... 18/10/2014 00:00 06/04/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from St Georges avenue to Granville Road... 13/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 04/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Start Date approx. - surfacing works to be carried out in the financial yea... On the carriage way from Dene street to Marlborough Hill... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Ewell by pass to the end... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from High Street to Brewery Road... 29/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On carriage way from junctions Clarence Street to Wraysbury Road... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from poole road to the end... 15/05/2014 00:00 21/05/2015 23:59 roadworksModerate
Year 2. Project Horizon. Start Date approx. - surfacing works to be carried out in the financial yea... On the carriage way from The Street to Penrose road... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Hurst Road to Vine Road... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 01/10/2014 00:00 03/04/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from London Road to the end... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Prices Lane to Sandcross Lane... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 25/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from London Road to Gibons Grove Roundabout... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Surfacing Works... On the carriage way from Frimley Road to Victoria Avenue... 06/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... From the bus shelter near the junction of Shere Road to Glebe Cottages... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from 'Stonny Croft to A24' to the junction The Street... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Surfacing Works... On the carriage way from Birdge street to Park Street... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between Gordon Road to Fairhaven... 28/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Surfacing Works.... On the carriage way from London Road to Frimley By-pass... 06/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way between Portsmouth Road and Wyndham Ave... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Upper Cobham Road to Martindale Avenue... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Hermitage Woods Crescent to Copley Close... 25/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Ashton Close to Queens Road... 13/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between Green Lane to Little Green Lane, including the two mini-roundabouts... 13/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Dale Road to Mayo Road... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the Carriage Way from Sanderfield Road to High Street... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Goreswood Road to outside house number 81... 25/09/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Redstone Hill to Red Stone Park... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Station Approach to the end... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between Hook Heath Gardens to Holly Bank Road... 25/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Longmede Road to Lower Court Road... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Fenton Avenue to Warwick Avenue... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Chessington Road to Ewell By Pass... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Walton Road to Vine Road... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from West Road to Bell Street... 29/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Project Horizon - Surfacing Works... On the carriage way from Old London Road, Burford Bridge roundabout to Pixham Lane roundabout... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Dovers Green Road to Rushetts Road... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 04/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Project Horizon. Surfacing Works... On the carriage way from Cricket Hill to Kings Cross Lane... 29/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Vine Road to Arnison Road... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Dorking Road to Swanworth Lane... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... From Woodbridge Road to where the road splits into three lanes adjacent to no.3 Guildford Business P... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... ark 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Walton Road to Chalford Close... 04/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Field Common Lane to the Industrial Estate... 01/07/2014 00:00 06/04/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Beare Green R/B to Triggs Street... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 29/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Start Date approx. - surfacing works to be carried out in the financial yea... On carriage way from Onslow to Chertsey Street... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Church Road to Bridge Road... 30/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Start Date approx. - surfacing works to be carried out in the financial yea... On the carriage way from Kennel Lane to Cock Lane... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between Eastway to Lower Court Road... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from St Leaonards Road to Kings Drive... 25/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Cumberland Road to the end... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Ashdown Road to the end... 16/06/2014 00:00 30/06/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 01/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 04/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... From the junction of Epsom Road to adjacent to Green Roof Cottage (both sides of Carriageway)... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between The Street to the public bridleway... 04/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Cedar Way to the Roundabout... 31/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 31/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between Hermitage Road/Robin Hood Road to number 19... 25/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... The bellmouth onto St Johns Road... 25/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between St Johns Road to adjacent to Edbrooke House... 25/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Junction of Ladymead to townpath from Woodbridge Road to Stoke Road... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length of the road... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Surfacing Works.... Entire length of the road... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... For the entire length including roundabout... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Lay by 07/07/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Surfacing Works... Entire length of the road... 29/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Woodhill Lane to Highcroft... 05/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... At the bellmouth onto the junction of Epsom Road... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... The entire length of the road... 04/11/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Home Farm Close to Old Reigate Road... 10/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Year 2. Project Horizon. Surfacing Works... On the carriage way from Church Road to Covent Road... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from High Street to Mere Road... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Annet Close to Halliford Road... 07/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Windmill Lane to St Johns Avenue... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 29/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... Between Station Road to South Street... 31/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way from Wallace fields to East Street... 23/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... From Midleton Road to the junction of ladymede... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... From Midleton Road to the carpark into magnet (including the junction of ladymede)... 18/10/2014 00:00 31/03/2015 23:59 roadworksModerate
Start Date approx. - surfacing works to be carried out in the financial year of 2014 to 2015.... On the carriage way for the entire length... 21/10/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM LEE GREEN LANE TO TILLEY LANE.... 15/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM WILLOWDENE CORNER TO OUTSIDE No's 54/58.... 15/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM No. 80 PASS JUNCTION WITH HOLMESDALE ROAD TO OUTSIDE No.19... 15/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM No. 8 TO JUNCTION WITH WILDCROFT DRIVE.... 15/12/2014 00:00 31/03/2015 23:59 roadworksModerate
START DATE APPROX. - LSR SURFACING WORKS TO BE CARRIED OUT IN THE FINANCIAL YEAR OF 2014 to 2015.... FROM JUNCTION WITH LARKSPUR WAY TO OUTSIDE No. 11... 15/12/2014 00:00 31/03/2015 23:59 roadworksModerate
Plant Mobilisation for the LSR works on Westcott Street... At the junction of Westcott Street... 06/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Surfacing Works From junction with Guildford Road to adjacent to The Pound Cottage... 06/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Island and gully Works... Bridge street to High street... 19/02/2015 00:00 06/03/2015 23:59 roadworksModerate
JUNCTION UPGRADES, KERB REALIGNMENT AND TRAFFIC SIGNAL INSTALLATION.... FROM STOKE ROAD CROSSROADS TO WOODBRIDGE ROAD.... 26/01/2015 00:00 15/05/2015 23:59 roadworksModerate
JUNCTION UPGRADES. KERB REALIGNMENT AND TRAFFIC SIGNAL INSTALLATION FOR SHARED PEDESTRIAN AND CYCLE... A25 Midleton road westbound lane 1 rental, Midleton Industrial estate northbound Safety Zone... 26/02/2015 00:00 15/05/2015 23:59 roadworksModerate
40mm Inlay. Night work 20:00 to 06:00. In conjunction with J107120025/095... 140 mtrs either side of London Road... 11/11/2014 00:00 13/03/2015 23:59 roadworksModerate
Service Pipe Repair<33mm Carriage in Carriageway.... White Lea 04/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE... ABOVE M25 06/03/2015 00:00 06/03/2015 23:59 roadworksModerate
Carriageway patching Victory Park road at junction with Station road... 04/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Start Date approx. - LSR footway surfacing works to be carried out in the financial year of 2014 to... On the footway between Farleigh Road to The Green... 05/03/2015 00:00 11/03/2015 23:59 roadworksModerate
Start Date approx. - LSR surfacing works to be carried out in the financial year of 2014 to 2015.... Entire length 26/02/2015 00:00 31/03/2015 23:59 roadworksModerate
VEGETATION CLEARANCE AND CRASH BARRIER.... ON BRIDGE OVER THE BOURNE. SEE ATTACHED MAP.... 23/02/2015 00:00 06/03/2015 23:59 roadworksModerate
Secant Piling, Installation of new culvert, Tree Felling, Embankment Stabilisation, VRS installation... A29 Beare Green Road. Please see attached location map.Martin aware.Please contact Supervisor any qu... 09/02/2015 00:00 29/05/2015 23:59 roadworksModerate
Footway widening, Cycleway construction, Traffic signal instalation... Waterside Drive to The Grove, northern footway... 10/02/2015 00:00 10/04/2015 23:59 roadworksModerate
Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE... 30 (OPP) 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE... 4 REVERE WAY 05/03/2015 00:00 09/03/2015 23:59 roadworksModerate
REMEDIAL WORKS IN C/W... Oatlands CHILDRENS PLAYGROUND, close to junction with Barnham Close... 06/03/2015 00:00 06/03/2015 23:59 roadworksModerate
REMEDIAL WORKS IN C/W... Oatlands Drive, opp no 48 close to junction with Barnham Close... 06/03/2015 00:00 06/03/2015 23:59 roadworksModerate
MAINS INSTALLATION TO NEW DEVELOMENT ON BEHALF OF AFFINITY WATER - CW/FW - CHPT8 AND 2 WAY LIGHTS WI... OPP HEATH DRIVE JN, SEND ROAD, , SEND, SURREY... 20/02/2015 00:00 06/03/2015 23:59 roadworksModerate
M25 anti-clockwise between J6 and J5 anticlockwise M25 anti-clockwise between J6 and J5. Direction = anticlockwise 06/03/2015 19:13 06/03/2015 20:15 incidentSlight
M25 anti-clockwise between J10 and J9 anticlockwise M25 anti-clockwise between J10 and J9. Direction = anticlockwise 28/11/2014 22:00 31/03/2015 05:30 roadworksSlight
A3 northbound between A247 and B2039 northBound A3 northbound between A247 and B2039. Direction = northBound 22/10/2014 22:00 04/12/2015 06:00 roadworksSlight
M3 eastbound between J4 and J3 eastBound M3 eastbound between J4 and J3. Direction = eastBound 06/03/2015 21:00 28/03/2015 06:00 roadworksSlight
link road from M25 J12 clockwise to M3 J2 westbound westBound link road from M25 J12 clockwise to M3 J2 westbound. Direction = westBound 04/11/2014 22:00 28/03/2017 05:00 roadworksSlight
link road from M25 J12 anti-clockwise to M3 J2 westbound westBound link road from M25 J12 anti-clockwise to M3 J2 westbound. Direction = westBound 04/11/2014 22:00 28/03/2017 05:00 roadworksSlight
M3 westbound between J4 and J4A westBound M3 westbound between J4 and J4A. Direction = westBound 06/03/2015 21:00 28/03/2015 06:00 roadworksSlight
M25 clockwise between J5 and J6 clockwise M25 clockwise between J5 and J6. Direction = clockwise 02/03/2015 22:00 09/03/2015 05:30 roadworksSlight
M3 westbound between J2 and J3 westBound M3 westbound between J2 and J3. Direction = westBound 19/02/2015 22:00 28/03/2015 06:00 roadworksSlight
M3 eastbound between J3 and J2 eastBound M3 eastbound between J3 and J2. Direction = eastBound 06/03/2015 21:00 28/03/2015 06:00 roadworksSlight
M3 westbound between J3 and J4 westBound M3 westbound between J3 and J4. Direction = westBound 06/03/2015 21:00 28/03/2015 06:00 roadworksSlight
Trace, then excavate to repair a gas escape and reinstate where possible... O/S British Gas and Sainsbury's in the C/W and F/W... 12/02/2015 00:00 19/03/2015 23:59 roadworksUnknown
LAY NEW DOMESTIC SERVICE 15M FROM MAIN IN CARRIAGEWAY... CARRIAGEWAY ADJACENT TO NO 15 SHAW CLOSE... 03/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
Trace, then excavate to repair gas escape and reinstate where possible... F/W O/S 98 - 100, WINDMILL ROAD... 23/02/2015 11:17 13/03/2015 23:59 roadworksUnknown
Trace, then excavate to repair gas escape and reinstate where possible... o/s 14b 04/03/2015 11:01 10/03/2015 23:59 roadworksUnknown
22:00-05:30hrs, lane 1 closure anticlockwise entry slip, for pavement repairs. M25, Jct 10 Anticlockwise entry slip. One Lane closed. 23/02/2015 22:00 02/04/2015 05:30 roadworksUnknown
22:00hrs to 05:00hrs Lane 3/2 closure switching to L1/2 Closure westbound for urgent technology works A316, Jn TFL Boundary to Jn M3. 06/03/2015 23:00 07/03/2015 02:00 roadworksUnknown
2300-0500 hrs, Lane 3&4 closure clockwise and Lane 4 closure anticlockwise for structure inspection work M25, Jn 9 to Jn 10 / Jn 10 to Jn 9. Two Lanes closed. 06/03/2015 23:00 07/03/2015 05:00 roadworksUnknown
Barrier Repair - M23, Southbound, 34/7. M23, M23 SOUTHBOUND 34/7. One Lane closed. 06/03/2015 20:00 07/03/2015 06:00 roadworksUnknown
Barrier repair - Northbound, 40/7. M23, M23, 40/7, Northbound.. One Lane closed. 06/03/2015 20:00 07/03/2015 06:00 roadworksUnknown
2200-0530hrs, Lane 1,2,3 Closure Anti-Clockwise, for Bridge Joint Replacement Works M25, Jct 14 to Jct 13. 06/03/2015 22:00 07/03/2015 05:30 roadworksUnknown
Lane 1 Closure 2200 to 0600 Installation of Hard Standing area A3, Stoke On slip North Bound. 06/03/2015 22:00 07/03/2015 06:00 roadworksUnknown
Lane 1 2200 to 0600 Installation of Vehicle Hard Standing area A3, Hogs Back to Compton (Mp 30/5 to 29.0) + Slip Night Closures. 06/03/2015 21:00 07/03/2015 06:00 roadworksUnknown
Lane 1/2 Closure 2100 to 0600 Smart Motorways M3, Jct 4 (Mp 49/5 to 54/0) South Bound. 06/03/2015 21:00 07/03/2015 06:00 roadworksUnknown
22:00 - 05:30 Lane 1,2,3 or Lane 4,3,2 Closure Clockwise Carriageway . Required for Re-Surfacing M25, Jn 5 to Jn 7. 06/03/2015 23:00 07/03/2015 06:00 roadworksUnknown
Scheme - Crabhill Geotech - Nightworks, North and Southbound lane 1 closure M23, North and Southbound near Jct 8. 06/03/2015 20:00 07/03/2015 06:00 roadworksUnknown
Scheme - M23 Sign Renewals SB - Nightworks, Southbound, Various lane closures M23, Southbound between Jct 8 and Jct 10a. 06/03/2015 20:00 07/03/2015 06:00 roadworksUnknown
Scheme - M23 Horley Pavement, NB - Nightworks, Northbound, Carriageway closures M23, Northbound at Horley. 06/03/2015 20:00 07/03/2015 06:00 roadworksUnknown
Scheme - M23 Horley Pavement SB - Nightworks, Southbound, Carriageway closures M23, Southbound at Horley. 06/03/2015 20:00 07/03/2015 06:00 roadworksUnknown
24hrs narrow lanes, both directions, for Managed Motorway scheme by Area 3. M3, Jct 1 to Jct 3. 29/10/2014 22:00 28/03/2017 05:00 roadworksUnknown
24hrs link roads narrow lanes, M25 clockwise and anticlockwise to westbound M3, for Managed Motorway scheme by Area 3. M3, Jct 12 link roads. M25 clockwise and anticlockwise to westbound M3. 19/07/2014 22:00 30/05/2016 05:00 roadworksUnknown
23:00hrs to 05:00hrs: Lane 3 and 4 closure, anticlockwise for routine maintenance. M25, Jct 6 to Jct 5. Two Lanes closed. 06/03/2015 23:00 07/03/2015 05:00 roadworksUnknown
23:00hrs to 05:00hrs: Lane 4 and 3 closure, clockwise for routine maintenance. M25, Jct 5 to Jct 6. Two Lanes closed. 06/03/2015 23:00 07/03/2015 05:00 roadworksUnknown
Access required into UG network as per lux survey 133-s005374 Rd Closure and lane closure night time working. Access required into UG network along A31 Hogs Back Puttenham Surrey GU3 1DG. A3, slip rd Puttenham Hogs Back Puttenham Surrey GU3 1DG. 04/03/2015 00:00 01/04/2015 23:59 roadworksUnknown
22:00 - 05:30 Lane 1,2,3 or Lane 4,3,2 Closure Anti Clockwise Carriageway . Required for Re-Surfacing M25, Jn 7 to Jn 5. 06/03/2015 23:00 07/03/2015 06:00 roadworksUnknown
22:00 - 05:30 Lane 1,2,3 or 4,3,2 Closure Clockwise Carriageway . Required for Re-Surfacing. M25, Jn 6 to Jn 8. 06/03/2015 23:00 07/03/2015 06:00 roadworksUnknown
Closed Follow Diversion 2200 to 0600 grass cutting A3, A3 Cathedral Off Slip Southbound. 06/03/2015 21:00 07/03/2015 06:00 roadworksUnknown
Closed Follow Diversion 2200 to 0600 grass cutting A3, Compton Off Slip Southbound. 06/03/2015 21:00 07/03/2015 06:00 roadworksUnknown
23:00hrs to 06:00hrs: Lane 1 and 2 closure, both carriageways for technology works. M25, Jct 6 to Jct 5/Jct 5 to Jct 6.. 06/03/2015 23:00 07/03/2015 06:00 roadworksUnknown
2200-0530hrs, Lane 1 & 2 closure, clockwise for sign works M25, Jn 8 to Jn 9. 09/02/2015 22:00 10/03/2015 05:30 roadworksUnknown
2200-0530hrs Lane 123 closure anti clockwise for carriageway repairs M25, Jn 9 to Jn 8. 06/03/2015 22:00 07/03/2015 05:30 roadworksUnknown
2200-0530 hrs, Lane 2 closure, anti-clockwise for carriageway-reconstruction/repair. A3, A3 Ockham Slip road. One Lane closed. 06/03/2015 22:00 18/03/2015 05:30 roadworksUnknown
22:00-05:30hrs, lane 1, 2 and 3 closure anticlockwise, for pavement repairs. M25, Jct 10 to Jct 9. Two Lanes closed. 23/02/2015 22:00 02/04/2015 05:30 roadworksUnknown
2100 - 0530 lane 1 and 2 closure eastbound for construction improvements and Upgrading. M3, Jn 3 to Jn 1. 06/03/2015 22:00 07/03/2015 06:00 roadworksUnknown
2100-0530Hrs, lane 1 closure, clockwise for major scheme M25, Jn 11 to Jn 12. 06/03/2015 22:00 07/03/2015 06:00 roadworksUnknown
2200-0530hrs, lane 1 closure anticlockwise for motorway upgrade M3, M25 Anticlockwise link to M3 Eastbound. 06/03/2015 22:00 07/03/2015 06:00 roadworksUnknown
2100-0530hrs, lane 1 closure westbound for motorway upgrade M3, Jn1 to Jn 3. 06/03/2015 22:00 07/03/2015 06:00 roadworksUnknown
2200-0500 hrs, Lanes 1, 2 & 3 closure, clockwise for Lining and stud works M25, Jn 10 to Jn 12. 06/03/2015 22:00 07/03/2015 05:00 roadworksUnknown
2200-0500 hrs, Lanes 1,2 &3 closure, anti-clockwise for lining and stud work works M25, Jn 12 to Jn 10. 06/03/2015 22:00 07/03/2015 05:00 roadworksUnknown
tap 4" main, lay 2 x 25mm com pipe in 1 trench, 20m long, fix meters in chambers - f/w... 103-109 03/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
tap 4" main, lay 1 x 50, 28.3m long, 4 way manifold + meters - f/w... between 71-75& 76-80 02/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
reinstatement - f/w + c/w... 7 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
make psc operable southview - 6 providence cottages... 04/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
reinstatement c/w allottments 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
renew/repair defective msm - f/w... 39 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
dig out psc - f/w adj 2 inglenook yard 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
renew lead com pipe (customer renew) - f/w... 35 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
resite psc - f/w 23 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
cut in new psc - f/w pendly oaks 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
cut in new psc - f/w op keepers cottage 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
replace lead com pipe after leak - f/w... 18 04/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
renew com pipe (stage 2 failure) - f/w + c/w... 107 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
renew lead com pipe (customer renew) - install 15mm meter - f/w + c/w... 53 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
lay new water comm pipe... 15a 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
repair leaking comm pipe... 2 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
relay leaking lead water pipe causing poor flow... 8 05/03/2015 14:00 09/03/2015 23:59 roadworksUnknown
repair leak on com pipe - f/w... adj grassfield (willow trees nursery)... 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
repair leak on com pipe - f/w... cheval court 04/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
repair leak on com pipe at psc - f/w... trimdene 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
repair/renew& retest supply - f/w... 35 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
repair leak on com pipe - f/w + c/w... 8 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
repair/renew& retest supply- f/w... 2 fair view 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
repair/renew& retest supply, change psc for new msm - f/w... bluebell wood 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 69 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
reinstatement f/w conc + edging... 50 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 64 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 47 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 18 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 131 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 1 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 5 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 37 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
FIT EXTERNAL METER FOOTWAY... 5 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
RENEW PSC COVER - WITHIN FOOTPATH... OUTSIDE ST MARYS CHURCH HALL... 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
Install 138m of 1 way poly duct in Footway... OPP ENT IMBERPARK KENNELS, FOLLOWING ROAD 138M SOUTH, NUTTY LANE... 25/02/2015 00:00 11/03/2015 23:59 roadworksUnknown
Build 1 concrete chamber 1820mm x 680mm x 1665mm deep in Carriageway,Install 2m of 1 way poly duct i... Ryan Hilldrup has spoke to Michelle Barwick and works have not yet taken place, and therefore the S5... 17/02/2015 00:00 06/03/2015 23:59 roadworksUnknown
Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 1m of 1 way poly duct in Foo... O/S ENTRANCE TO KENLEY AERODROM, VICTOR BEAMISH AVENUE... 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
Install 5m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building... o/s 31 , LYON ROAD 04/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Demolish 1 existing jointbox(s) or... OPP FLATS 13-18 , LONGFIELD CRESCENT... 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
Demolish 1 existing jointbox(s) or cabinet base(s),Erect/Renew 1 PCP cabinet and base (600mm x 300mm... S/O 33 ROW TOWN ON, FRANKLANDS DRIVE... 05/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
Replace 1 jointbox frame and cover(s) (725mm x 225mm) in Footway... O/S 32 , PALACE ROAD 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
Install 3m of 1 way poly duct in Verge... OPP JNC GREENHURST LANE ON, HURSTLANDS... 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
Replace 1 jointbox frame and cover(s) (915mm x 445mm) in Footway... IN F.W O/S 158A, GODSTONE ROAD... 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
Build 2 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 27m of 1 way poly duct in Ve... O/S HOMEFIELD GOING EAST FOR 27m, GUILDFORD ROAD... 03/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
1 ,Install 12m of 1 way poly duct in Carriageway... C/W O/S 12 TO 18, PINE GARDENS... 03/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
1 ,Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 6m of 1 way poly duct in... F/W SITE ENTRANCE HOOKWOOD S/O 16, WITHEY MEADOWS... 03/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
1 ,Build 2 concrete chamber 915mm x 445mm x 965mm deep in Footway,Demolish 2 existing jointbox(s) o... OPP COPPER BEECH TO ACROSS C/W TO OS COPPER BEECH, CAVENDISH ROAD... 21/02/2015 00:00 09/03/2015 23:59 roadworksUnknown
Mains replacement Major works... START X 510013 Y 170179 END X 510013 Y 170179... 01/01/2015 00:00 31/03/2015 23:59 roadworksUnknown
Mains replacement Major works... START X 510003 Y 170487 END X 510226 Y 170490... 01/01/2015 00:00 31/03/2015 23:59 roadworksUnknown
Mains replacement Major works... START X 510022 Y 170229 END X 510022 Y 170229... 01/01/2015 00:00 31/03/2015 23:59 roadworksUnknown
Install 5m of 1 way poly duct in Footway,Install 7m of 1 way poly duct in Carriageway... O/S 81 CROSSING C/W TO OPP 81 WESTFIELD AVENUE... 04/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
Install 5m of 1 way poly duct in Carriageway,Install 5m of 1 way poly duct in Verge... IN F.W. FROM O/S THE OLD COACH HOUSE, ST GEORGES AVENUE.... 27/02/2015 00:00 16/03/2015 23:59 roadworksUnknown
Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 2m of 3 poly ducts in Footway... S/O THE BAYS,jnc of SEND MARSH ROAD on,, MAPLE ROAD... 05/03/2015 00:00 11/03/2015 23:59 roadworksUnknown
Build 1 concrete chamber 1820mm x 680mm x 1665mm deep in Carriageway,Install 10m of 1 way poly duct... Sect 58 waiverd by natasha haider, OPP PINE RIDGE GOLF CENTRE CROSSING CWAY TO ENTRANCE , OLD BISLEY... 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
Install 75m of 1 way poly duct in Footway... OPP 34 TO 75M SOUTH FROM OPP 34, COPSEM LANE... 02/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
Install 75m of 1 way poly duct in Footway... OPP 34 TO 75M SOUTH FROM OPP 34, COPSEM LANE... 02/03/2015 00:00 06/03/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 324.0m of 125mm pe water pipe @ 12.0m= 27 days /test , flush chlorinate and sample new main - 22... from o/s 25 to junction with Victoria Rd... 10/11/2014 00:00 17/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 325.0m of 125mm pe water pie @ 12.0m per day =28 days/ test ,chlorinate , flush and sample new m... from junction with Church road to junction with Massets road... 18/12/2014 00:00 01/04/2015 23:59 roadworksUnknown
lay 65.0m of 125mm pe water pipe@12.0m per day = 5 days/test , chlorinate , flush and sample new mai... fom o/s 18 to junction victoria rd... 23/02/2015 00:00 01/05/2015 23:59 roadworksUnknown
lay 168.0m of 125mm pe water pipe-@12.0m per day = 14.days/test, flush chlorinate and sample new mai... from junction with Victoria Rd to junc. with Upfield... 04/02/2015 00:00 08/06/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
lay 270.0m of 90mm pe water pipe@12.0m per day =23 days/ test ,chlorinate ,flush and sample new main... from junction with Victoria Rd to junction with Earlsbrook Rd... 10/11/2014 00:00 20/04/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd to end of close... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... jctSt Johns Rd 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
transfer 7 water services... from junction with St Johns Rd (adj.38) to end of close -o/s 8... 03/03/2015 00:00 16/03/2015 23:59 roadworksUnknown
lay 204m of 180mm pe pipe@12.0m per day= 17 days/ test chlorinate ,flush and sample new main= 22 day... horley road to royal earlswood park... 18/12/2014 00:00 10/04/2015 23:59 roadworksUnknown
lay 204m of 180mm pe pipe@12.0m per day= 17 days/ test chlorinate ,flush and sample new main= 22 day... horley road to royal earlswood park... 18/12/2014 00:00 10/04/2015 23:59 roadworksUnknown
lay 204m of 180mm pe pipe@12.0m per day= 17 days/ test chlorinate ,flush and sample new main= 22 day... horley road to royal earlswood park... 18/12/2014 00:00 10/04/2015 23:59 roadworksUnknown
lay 204m of 180mm pe pipe@12.0m per day= 17 days/ test chlorinate ,flush and sample new main= 22 day... horley road to royal earlswood park... 18/12/2014 00:00 10/04/2015 23:59 roadworksUnknown
lay 204m of 180mm pe pipe@12.0m per day= 17 days/ test chlorinate ,flush and sample new main= 22 day... horley road to royal earlswood park... 18/12/2014 00:00 10/04/2015 23:59 roadworksUnknown
lay 204m of 180mm pe pipe@12.0m per day= 17 days/ test chlorinate ,flush and sample new main= 22 day... horley road to royal earlswood park... 18/12/2014 00:00 10/04/2015 23:59 roadworksUnknown
lay 204m of 180mm pe pipe@12.0m per day= 17 days/ test chlorinate ,flush and sample new main= 22 day... horley road to royal earlswood park... 18/12/2014 00:00 10/04/2015 23:59 roadworksUnknown
RENEW STOPCOCK (X2) AND FIT METER IN DBM FOOTWAY... 28, UPLAND ROAD, CAMBERLEY, SURREY, GU15 4JW... 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
REPLACE LEAKING COMMUNICATION PIPE IN THE DBM FOOTWAY... 9, CUMBERLAND ROAD, CAMBERLEY, SURREY, GU15 1SF... 02/03/2015 10:30 06/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN DBM FOOTWAY... 24, TRAFALGAR COURT, FARNHAM, SURREY, GU9 7QE... 02/03/2015 10:30 06/03/2015 23:59 roadworksUnknown
RENEW STOPCOCK AND METER IN GRASS VERGE... 16, FLATS NEXT TO PHYLISS, MENIN WAY, FARNHAM, SURREY, GU9 8DY... 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
RENEW STOPCOCK AND METER IN DBM FOOTWAY... UNIT 3, 248, SHAWFIELD ROAD, ASH, ALDERSHOT, HAMPSHIRE, GU12 5DJ... 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN DBM FOOTWAY... TAVIRA, WHITE LANE, ASH, ALDERSHOT, HAMPSHIRE, GU12 6HN... 02/03/2015 13:10 06/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN DBM FOOTWAY... 22, HEATH LANE, FARNHAM, SURREY, GU9 0PU... 05/03/2015 09:30 11/03/2015 23:59 roadworksUnknown
RENEW STOPCOCK AND FIT METER... 4, PARTRIDGE CLOSE, FRIMLEY, CAMBERLEY, SURREY, GU16 8PD... 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
REPAIR LEAKING COMMUNICATION PIPE IN THE DBM FOOTWAY... 25, LOWER HANGER, HASLEMERE, SURREY, GU27 1LU... 05/03/2015 12:35 11/03/2015 23:59 roadworksUnknown
REPLACE INOPERABLE LEAKING STOPCOCK IN DBM FOOTWAY, NEEDED TO CONTROL BAD INTERNAL LEAK... 25, CRANMORE ROAD, MYTCHETT, CAMBERLEY, SURREY, GU16 6EW... 03/03/2015 09:00 09/03/2015 23:59 roadworksUnknown
REPLACE LEAKING COMMUNICATION PIPE IN THE DBM FOOTWAY... 49, LE MARCHANT ROAD, CAMBERLEY, SURREY, GU15 1HZ... 05/03/2015 12:20 11/03/2015 23:59 roadworksUnknown
REPLACE LEAKING COMMUNICATION PIPE IN THE DBM FOOTWAY... 17, JAMES ROAD, CAMBERLEY, SURREY, GU15 2RG... 04/03/2015 08:40 10/03/2015 23:59 roadworksUnknown
REPAIR LEAKING COMMUNICATION PIPE IN THE DBM FOOTWAY... 86, HATCHETTS DRIVE, HASLEMERE, SURREY, GU27 1LZ... 05/03/2015 11:45 11/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN THE CARRIAGEWAY... 3, MYERS WAY, FRIMLEY, CAMBERLEY, SURREY, GU16 9NZ... 05/03/2015 14:15 11/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN THE CARRIAGEWAY... 3, MYERS WAY, FRIMLEY, CAMBERLEY, SURREY, GU16 9NZ... 05/03/2015 14:10 11/03/2015 23:59 roadworksUnknown
REPAIR BURST 14" MAIN LEAKING IN THE UNMADE VERGE... ASH GREEN LANE WEST JUNCTION WITH BRIDLEWAY, ASH, ALDERSHOT, HAMPSHIRE, GU12 6NG... 02/03/2015 11:30 06/03/2015 23:59 roadworksUnknown
REPAIR BURST 4" CAST IRON MAIN LEAKING IN THE DBM FOOTWAY... 8, DONNINGTON CLOSE, CAMBERLEY, SURREY, GU15 3NJ... 02/03/2015 11:40 06/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN DBM FOOTWAY... 21, LIME AVENUE, CAMBERLEY, SURREY, GU15 2BS... 03/03/2015 11:00 09/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN DBM FOOTWAY... 168, HENLEY DRIVE, FRIMLEY GREEN, CAMBERLEY, SURREY, GU16 6JU... 04/03/2015 13:45 10/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN DBM FOOTWAY... 55, ROMAN WAY, FARNHAM, SURREY, GU9 9RG... 05/03/2015 08:30 11/03/2015 23:59 roadworksUnknown
REPLACE LEAKING STOPCOCK IN DBM DRIVEWAY... 6, BALL& WICKET LANE, FARNHAM, SURREY, GU9 0PD... 05/03/2015 15:10 11/03/2015 23:59 roadworksUnknown
CUSTOMER METER INSTALLATION... OUTSIDE 4 05/03/2015 00:00 09/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... BETWEEN 4 AND 93 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... OUTSIDE 35 SHORTHEATH ROAD... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
RAISE UP SUNKEN PATCH IN DBM FOOTWAY - URGENT JOB AS TRIP HAZARD... Outside 110 Shortheath Road, Farnham... 05/03/2015 15:00 06/03/2015 23:59 roadworksUnknown
CUSTOMER METER INSTALLATION... OUTSIDE 12 06/03/2015 00:00 10/03/2015 23:59 roadworksUnknown
TO RELAY 85 METERS OF OLD DRINKING WATER MAIN AND RELATED SERVICES... between Saddleback road and number 21 Rowan close... 24/11/2014 00:00 13/03/2015 23:59 roadworksUnknown
TO RELAY 210 METERS OF OLD DRINKING WATER MAIN AND 62 RELATED SERVICES... between Rowan close and Wishmoor road... 24/11/2014 00:00 13/03/2015 23:59 roadworksUnknown
TO RELAY 210 METERS OF OLD DRINKING WATER MAIN AND 62 RELATED SERVICES... between Rowan close and Wishmoor road... 24/11/2014 00:00 11/03/2015 23:59 roadworksUnknown
TO RELAY 210 METERS OF OLD DRINKING WATER MAIN AND 62 RELATED SERVICES... between Rowan close and Wishmoor road... 24/11/2014 00:00 18/03/2015 23:59 roadworksUnknown
Connection for scheme to relay OLD DRINKING WATER MAIN... junction with High Street... 05/01/2015 00:00 31/08/2015 23:59 roadworksUnknown
Connection for scheme to relay OLD DRINKING WATER MAIN... junction with High Street... 05/01/2015 00:00 31/08/2015 23:59 roadworksUnknown
Connection for scheme to relay OLD DRINKING WATER MAIN... junction with High Street... 05/01/2015 00:00 31/08/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 1115m of 125mm pe water pipe @300.0m per week =20 days/test ,chlorinate ,flush and sample new wa... from junction with Roothill lane to junction with Gadbrook road... 20/08/2014 00:00 13/03/2015 23:59 roadworksUnknown
lay 675m of 125mm pe pipe@12.0m per day=57 days/test, flush, chlorinate and sample new main-22 days/... from junction with Star lane to o/s 3 Rowan Grove... 23/02/2015 00:00 08/09/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 341.0m of 125mm water pipe@12.0m per day= 29 days/test,chlorinate ,flush and sample new main-22... from o/s 1 to o/s 34 20/10/2014 00:00 27/05/2015 23:59 roadworksUnknown
lay 165m of 90mm main, with 12 services& 3 connections - (165m @ 12m per day - 14 days, chloranation... jct star lane to no 9... 27/02/2015 00:00 19/03/2015 23:59 roadworksUnknown
lay 165m of 90mm main, with 12 services& 3 connections - (165m @ 12m per day - 14 days, chloranation... jct star lane to no 9... 27/02/2015 00:00 19/03/2015 23:59 roadworksUnknown
lay 165m of 90mm main, with 12 services& 3 connections - (165m @ 12m per day - 14 days, chloranation... jct star lane to no 9... 27/02/2015 00:00 19/03/2015 23:59 roadworksUnknown
lay 165m of 90mm main, with 12 services& 3 connections - (165m @ 12m per day - 14 days, chloranation... jct star lane to no 9... 27/02/2015 00:00 19/03/2015 23:59 roadworksUnknown
lay 165m of 90mm main, with 12 services& 3 connections - (165m @ 12m per day - 14 days, chloranation... jct star lane to no 9... 27/02/2015 00:00 19/03/2015 23:59 roadworksUnknown
lay 165m of 90mm main, with 12 services& 3 connections - (165m @ 12m per day - 14 days, chloranation... jct star lane to no 9... 27/02/2015 00:00 19/03/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from junc. Church lane to junc Star lane... 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma... from o/s 1 to o/s 34 13/11/2014 00:00 09/04/2015 23:59 roadworksUnknown
lay448.0m of 125mm pe water pipe@12.0m per day=38 days/ test ,chlorinate and flush and sample new ma...